Light Demolition Jobs a Hauler Takes Apart
Light demolition is interior tear-out with hand tools: pry bars, reciprocating saws, a drill to back out screws, and nothing structural. Load-bearing walls, chimneys and anything that needs an engineer belong to a demolition contractor.

Kitchen cabinet tear-outs
Uppers come down first, then the countertop, then the base cabinets. Laminate tops break up easily; stone tops are heavy and need more hands. Cost guides put cabinet removal at:
| Kitchen size | Cabinet run | Removal price |
|---|---|---|
| Small | 12 to 20 linear feet | $150 to $400 |
| Average | 20 to 30 linear feet | $300 to $600 |
| Large | 30 to 50 linear feet | $450 to $800 |
Have the sink and dishwasher disconnected and the water shut off before the crew arrives. Older kitchens may contain mold, asbestos or lead, so mention the house's age when you call.

Bathroom vanity and tub tear-outs
The vanity, toilet and mirror are the quick part. The tub is what sets the price. National guides list tub removal at $150 to $750, and a cast-iron tub on a second floor can pass $1,000 because it either goes down the stairs whole or gets broken up in place. Tell the hauler the tub's material and which floor it is on.

Paneling, built-ins and closet shelving
Wood paneling, basement bars, built-in bookcases and wire closet systems. Paneling may be nailed straight to the studs or over drywall. If the drywall comes out as well, national guides put that at about $0.50 to $2.50 per square foot. Ask whether pulling leftover nails is part of the price.

Why Winston-Salem homeowners call Winston-Salem Junk Co.
- Your request goes to a single independent hauler
- Hear the all-in figure before anything is carried out
- Calling is free; the hauler bills only the job you OK
- Mention stairs, a gate code or a hot tub when you call
Permits and Old Materials in a Light Demolition
A tear-out that is the first step of a remodel may fall under a City remodel or demolition permit; the FAQ below has the fee. Pulling out cabinets and trim is the simple end. Once a job moves into walls, wiring or plumbing, check with the Inspections Division before anything comes out.
Older finishes are the bigger risk. Floor tile, mastic and pipe wrap from an older house can contain asbestos, which a junk crew should not disturb. See construction debris removal for the county contact and where torn-out material is taken.
How a Tear-Out Visit Runs
- STEP01
Shut-offs first
Water off and lines capped at the sink, toilet and dishwasher; breakers off for any disposal, light fixture or outlet in a cabinet run.
- STEP02
Walk-through and price
Once the crew has seen what's attached and how, ask for one price that covers removal and haul-off together.
- STEP03
Tear-out and loading
Pieces come out room by room and go straight to the truck. A good hauler lays down a path on finished floors.
- STEP04
Sweep and check
Ask for a broom-clean room and a look at the walls before the crew leaves, so you know what the next trade will find.
See carpet removal if the flooring is coming out in the same project.
